eipoh119

EIP Editing Office Hour (EIP + ERC) #119

Nov 10, 2026
Nov 10, 2026 · Meeting #119

EIP Editing Office Hour (EIP + ERC) #119

The first office hour after Devcon worked through a gas repricing EIP, website build fixes, and a batch of David Hay's ERCs moving to Final. Editors pinned the Ubuntu runner version to clear the broken site build on both the EIP and ERC repositories, and agreed that the Versioned Opcodes for Gas Repricing EIP is acceptable to move forward pending Sam's comment on the discussion thread and final editor approval. Three of David's ERCs (ERC-8325 Asset Anchor Registry, ERC-8326 Canonical Document Bundle Anchor, ERC-8327 Directional Transfer Domain Registry) were merged to Final after the requested changes were verified; a fourth was not pushed correctly and needs to be re-pushed. A large dark/light mode design-tokens CSS PR was left for another editor to pick up, a contributing.md PR narrowing the guide to ERC-20 was flagged as spam for closure, and a long proposal (PR 2099/2117) was deferred for asynchronous review due to its length.

Decisions
  • Versioned Opcodes for Gas Repricing EIP: acceptable to move forward; Sam will leave a comment on the discussion thread, with final editor approval still pending.
  • EIP website build fix: the PR pinning the Ubuntu version to resolve the broken Jekyll build is approved and force-merged.
  • ERC website build fix: the same Ubuntu version pin is applied to the ERCs repository.
  • Comprehensive CSS PR: the large dark/light mode design-tokens PR will not be reviewed by Sam unless another editor takes it up.
  • contributing.md PR: the PR narrowing the guide to ERC-20 is considered spam and can be closed.
  • David's proposals: three ERCs (8325, 8326, 8327) were approved to move to Final after the requested changes were verified; a fourth was not pushed correctly and needs to be re-pushed.
  • Large proposal (PR 2099/2117): review will continue asynchronously or in a future meeting due to its length.
Action items
  • Sam: leave a comment on the Versioned Opcodes for Gas Repricing discussion thread.
  • Sam: force-merge the EIP website build-fix PR once Yoham removes his review and the two required approvals are met.
  • Sam: create a corresponding PR for the ERCs repository to pin the Ubuntu version.
  • David: re-push the proposal changes that were not included in the previous push.
  • Editors: close the spam contributing.md PR that narrows the guide to ERC-20.
Pull requests reviewed (9)
Next: Meeting #120, Nov 17, 2026

AI Disclaimer: Some content or metadata on EIPsInsight may be AI-inferred or automatically compiled. If you find any discrepancy, please contact us at dev@avarch.org.