AllCoreDevs - Consensus #192
01 CALL BRIEF · HIGHLIGHTS & DECISIONS
What Happened on This Call
Key Decisions (4)
- EL green light: Glamsterdam ships as-is with EIP-8037; no spec change
- CL adopts PR 5770 (RLP payload block-hash verification) for Glamsterdam; PR 5820 deferred
- Hoodi Glamsterdam upgrade set for Epoch 143616, December 15, 2026 at 19:12 UTC
- No decision on FOCIL today; status quo (SFI headliner) holds until next ACDC; active removal requires near-unanimity including EL teams
Topics Covered (3)
Related Research
Detailed Notes by Topic
EF blog post proposes Keccak-256 as hash function for all PQ cryptography (LeanVM, XMSS, Sphinx); EL unaffected; CL signature scheme changes
Dmitry: duplex sponge construction requires Keccak permutation; SHA-3 alone insufficient; choice is consistent with existing EL usage
FOCIL headliner status under review; decision deferred to next call (two weeks)
FOCIL champion soispoke: without EIP-8288 aggregation, PQ FOCIL works out-of-box with ~16 PQ txs/slot; preferred path is minimal FOCIL + frames, no aggregation
Rough sentiment: Erigon, Nethermind, Prysm, EthPandaOps, ethlabs lean DFI for Hegota; Lodestar, Besu lean keep; ethrex undecided; no formal decision today
Caspar: FOCIL competes for same high-context bottleneck as PQ; governance should respond to changed threat landscape
Toni proposes Hegota as mainly EL fork (frames) + small CL cleanups; next CL-heavy fork targets PQDClock
EL rough consensus: ship EIP-8037 as-is; no spec change clears the bar vs. delay cost
CL decision: adopt PR 5770 (RLP block-hash check, non-consensus-breaking) over PR 5820; Sepolia compatibility preserved
Hoodi Glamsterdam upgrade locked: Epoch 143616, December 15 at 19:12 UTC
Jihoon to cut consensus-specs release today/tomorrow once two pending PRs reviewed
AI Disclaimer: Some content or metadata on EIPsInsight may be AI-inferred or automatically compiled. If you spot any discrepancy, please let us know.