FOCIL2026-10-13_044

FOCIL Breakout #044

2026-10-13 2 decisions 388 transcript lines

Transcript

Call summary

Targets
  • •FOCIL devnet 2 — targeting readiness from ethrex, Lodestar, Nethermind, Prysm; no firm date set - 00:04:31
Decisions
  • •Keep FOCIL devnet 1 running until devnet 2 is ready - 00:13:39
  • •FOCIL Breakout #46 tentatively moved to November 17 instead of November 10; to be confirmed at Breakout #45 - 00:49:00
Highlights
  • Spec Updates:
    • ·FOCIL EIP rebased from Fulu to Gloas; transaction-interaction with frames not yet included - 00:13:51
    • ·Three CL-spec PRs merged: two minor bug fixes, one IL deadline update (discussed at ACDC) - 00:14:26
  • Devnet Status:
    • ·FOCIL devnet 1 live but missing slots; Lighthouse fork-choice enforcement missing, PR under review - 00:04:31
    • ·ethrex ready for FOCIL devnet 2; has EIP-8198 implemented - 00:06:43
    • ·Lodestar merged EIPs 8365, 8015, 8198 to trunk; FOCIL branch merge expected within days - 00:09:04
    • ·Lodestar bug: ILs created on payload receipt, not after new-payload call (uses fallback path always); fix needed - 00:09:45
  • Client Updates:
    • ·Prysm joining FOCIL devnet 2; rebasing Terrence's prior FOCIL implementation - 00:08:11
    • ·Nethermind needs to assess EIP-8198 EL changes before devnet 2 - 00:09:49
  • Organizational:
    • ·FOCIL Breakout #45 in two weeks as scheduled; Breakout #46 tentatively moved to November 17 (from November 10) due to DEF CON - 00:45:38
    • ·FOCIL breakout will eventually be absorbed into ACDC; timing TBD, likely around FOCIL devnet 2 - 00:47:28
  • El Payload Building:
    • ·Besu strategy: first iteration builds minimal IL-only block; subsequent iterations add profitable txs; IL txs also sent to mempool - 00:19:14
    • ·Open question: how fast can ELs reseal a payload after new ILs arrive at 9s mark? Nico's builder: ~5ms; production ELs likely not optimized - 00:15:42
  • Focil Frames Design:
    • ·Marc's frames spec: builder commits to a claims object (tx-hash → evaluation index); included in execution payload envelope - 00:31:48
    • ·Per-IL max-verified-gas limit (1M gas) enforced on EL; membership bitmap maps IL transactions to source IL - 00:34:38
    • ·Alternative design raised: pass full ILs (not IL-txs) to EL via engine API; EL handles deduplication/omission; cleaner but higher bandwidth - 00:39:18
    • ·engine_getInclusionListStatus async ID mechanism questioned; may be unnecessary if alternative design adopted - 00:42:09
Action Items
  • •ethrex and all CL/EL teams - Review frames spec PRs (EIPs/12394, consensus-specs/5698, execution-apis/911) and provide feedback - 00:35:25

Key decisions

  • Keep FOCIL devnet 1 running until devnet 2 is ready

    Ensuring continuity between devnet 1 and devnet 2.
  • FOCIL Breakout #46 tentatively moved to November 17 instead of November 10; to be confirmed at Breakout #45

    Rescheduling due to DEF CON.

AI Disclaimer: Some content or metadata on EIPsInsight may be AI-inferred or automatically compiled. If you find any discrepancy, please contact us at dev@avarch.org.