EIPsInsight

Loading Experience

Preparing your insights...

Loading0%
All upgrades

Fulu/Osaka (Fusaka)

Live

PeerDAS-powered blob scaling, a 60M gas limit, and Blob Parameter Only forks.

Meta EIP-7607Activated 2025-12-03Block 23,935,694Osaka (EL) + Fulu (CL)

About Fulu/Osaka (Fusaka)

Fusaka followed the Pectra upgrade, focusing on scaling and efficiency. Its headlining feature is PeerDAS (Peer Data Availability Sampling), enabling significant blob throughput scaling. Fusaka also raised the L1 gas limit to 60M and introduced "Blob Parameter Only" (BPO) forks to safely scale blob capacity, alongside optimizations for L1 performance and UX.

Included

13

EIPs that are part of the activated upgrade on mainnet.

PeerDAS - Peer Data Availability Sampling

Contract Code Size Limit Increase

Gas Limit Cap for Network Stability

Blob Gas Target and Max

Contract Storage Optimization

Verkle Trees Integration

Block Size Limit Increase

Transaction Pool Improvements

State Expiry Mechanism

EIP Composition Timeline

Track EIP inclusion stages for Fulu/Osaka (Fusaka)

INCLUDED
SFI
CFI
PFI
DFI
759476427823782578837892791079177918793479357939795175947642782378257883789279107917791879347935793979517594764278237825788378927907791079177918793479357939795175947642782378257883789279077917791879347935793979517594764278237825788378927917791879357907793475947642782378257883789279177918793559207907793475947642782378257883789279187935592079077917793475947642782378837892793559207762782579077917791879347594764278237892793559207762782378257883790779177918793475947642789279355920776278237825788379077917791879347594764278925920776278237825788379077917791875947642789259207762782378257883790779177918663354036704200475054506206706974807594762076427692769878737892592076927761776278237825783478807883790779177918663354036704200475054506206706974807594762076427692769878735920769277617762782378257834788078837892790779186633540367042004750545062067069748075947620769276987873592076927761783478807883476268006873754576674762680068737545Sep 16, 25Jul 17, 25Jul 10, 25Jul 2, 25Jun 5, 25Jun 2, 25May 22, 25May 21, 25May 13, 25May 9, 25May 5, 25Apr 28, 25Apr 19, 25Apr 14, 25Mar 27, 25Apr 11, 24Feb 15, 24

Recent changes

Every time an EIP entered, left, or moved stages in this upgrade.

Email updates for Fulu/Osaka (Fusaka)

Follow inclusion and bucket changes for this upgrade.

Email me when EIPs are added, removed, or moved between upgrade buckets.